Care Management System · Inspection Readiness

Know where you stand before the inspector does

Care home inspection readiness across all five CQC key questions, built from the records your team is already creating. Not a checklist someone has to keep up to date — a read of what your own service can actually evidence today.

Five key questions, one honest answer each

Every evidence item is resolved against live records and lands in one of four states — ready, needs attention, breach risk, or not captured. The dashboard leads with the gaps, because the useful screen before an inspection is the one that tells you what to fix, not the one that tells you how well you’re doing.

  • Safe
  • Effective
  • Caring
  • Responsive
  • Well-led
A card per key question, each leading with its top gaps — and one list of what to do first

Down to the residents whose records are missing

Open a key question and every item explains itself: what good looks like in plain English, what the system currently finds, and — where it’s a coverage gap — exactly which residents it applies to. “0 of 3 residents have risk assessments” is a statistic. Three names is a morning’s work.

Each item carries its guidance, its live finding, and the residents it names

The static evidence, with its expiry dates

Statement of purpose, policies and procedures, fire and gas safety, LOLER, insurance, CQC registration. The documents an inspector expects on file, held per home with versions and expiry dates — so a lapsed certificate is a red badge on a screen rather than a discovery on the day.

  • Superseding a document is explicit — the previous version stays, it isn’t overwritten.
  • Expiry is tracked per document, and an expired one is flagged where you’ll see it.
  • Gaps here feed the same readiness picture as everything else.
Per-home document store with versions and expiry

One button, and the evidence is a document

Build the evidence pack and you get a dated PDF organised by key question — care-plan and risk coverage, the incident and safeguarding log, NEWS2 observations, dependency assessments, care-plan changes, governance documents — drawn from live records for the period you choose.

There’s an Excel export of the same sub-registers alongside it, for the inspector who would rather sort and filter than read.

  • Generated from live records, not a separate copy someone maintains.
  • Every pack generation is itself logged to the Reg 17 audit trail.
  • Choose the period — the pack covers the window you were asked about.
The generated pack — a dated PDF, organised the way you’ll be asked about it

Draft your Provider Information Return here

The PIR arrives with a four-week deadline, and a missed one caps Well-led at requires improvement on its own. FlexiEle holds the return as a working draft across all seven topic sections, pre-fills the figures it can compute from your records, and marks the rest clearly as yours to complete.

When it’s ready, copy the pack across into the provider portal. We don’t pretend to submit it for you — there’s no API to submit through.

The PIR as a working draft — auto-filled where we can, marked manual where we can’t
Evidence you already have
Inspection readiness shouldn’t be a project you start when the call comes. Every item here resolves off records your team created doing their job — so the honest answer to “are we ready?” is on a screen, on any given Tuesday.

See it on your floor

Book a walkthrough with your care setting in mind — we’ll show capture, oversight and the evidence trail end to end.

Book your demo